Opere complementari al passante di Mestre - Int. 1 - 4 - 8 - 8bis - 9, Mira Spinea Dolo - VE - Copia - Bisiolengineering

Go to content
COMPLEMENTARY WORKS TO THE PASSING OF MESTRE - int. 1 - 4 - 8 - 8bis - 9, Mira Spinea Dolo - VE
To rebalance the traffic flows caused by the presence of the Mestre motorway bypass, a series of completion works are foreseen, including interventions 1 (Roncoduro variant) 4 (Oriago-Borbiago connection) 8 (sp36 adjustment from Fossa to Rossignago) 8bis (connection Martiri della libertà street- via Capitanio) 9 (Connection Rossignago - Asseggiano). Technical service of structural and road design executive project for ing. Novarin (int 1 and 4).

Client                                                        
Veneto strade S.p.a.                                                   

Date
2006 - 2011

Amount
€ 33 343 806,55

Status of the work
Completed and tested works
Created by Emma Taverna, Martino Zaratin, Aurora Colla, Zeno Sirbu
BISIOL ENGINEERING
Galleria Progresso 11/3
30027 San Donà di Piave (VE)
tel. +39 0421330926    +39 04211840073
fax. +39 04211840073    +39 1782246542
info@bisiolengineering.net
bruno.bisiol@ingpec.eu
www.bisiolengineering.net
STUDIO DI INGEGNERIA BISIOL BRUNO
Galleria Progresso 11/3
30027 San Donà di Piave (VE)
tel. +39 0421330926    +39 04211840073
fax. +39 04211840073    +39 1782246542
info@bisiolengineering.net
bruno.bisiol@ingpec.eu
www.bisiolengineering.net

Back to content